Title
Go to content
Finally I have the time to relocate my dyno.
It is a big relieve that's its out off my workshop, as I can now walk through it don't need to climb anymore
Hope that it all work as planned.

Placed all the parts in a small van
Reload everything, using the lifter
Some parts of the old dyno setup are still there.
Need to remove it all
All removed, and clean
Making the right side pretty
Nice and tight
Making the back side pretty
All done
Start with placing the dyno
All horizontal now, on rubber blocks
Small indication on the end result
Slowly I'm getting there
Next thing will be connecting everything, so its all tight.
Also, place a band/strip so all the stone and wood will be not visible
10-09-19

Today I made the lower plate so you are not looking at the rubber blocks and stones.
Looking good
Back to content